Every fault you find, turned into a quote

See how →
Knowledge Centre

Jobs Raised as a Group, Checked as a Group

No more a note added to one job and invisible on the other eleven. No more working through a group job by job with the quote open alongside. The group behaves like one piece of work, because that's what it is.

WorkflowsAutomationsPosted: 03/09/2026Read time: 3 mins

Who it's for

Anyone raising related jobs as a group. Multi-visit contracts, phased works, quoted packages, planned schedules.

What it saves you

The reconciliation that meant opening every job in turn, and the query that follows when it doesn't get done.

Set up time

Days for the notes. Longer for the completion check.

How do you update a group at once?

Add a note to any job in a group and it appears against every job in that group, rather than only the one somebody happened to open.

Then, when the work completes, each job in the group gets checked back against the quote it belongs to. What was quoted, what was done and what's being billed all line up before anything reaches an invoice.

Two things, and you can run either without the other. Most people start with the notes.

Why groups drift apart

Because the group only really exists at the moment it's created. After that, every job is on its own.

Somebody rings about the works. Whoever takes the call adds a note to whichever job comes up first. Eleven other jobs in that group now have no record of the conversation, so the next person to look sees nothing. Access arrangements, a change the client asked for, the reason a visit moved. All recorded once, in one place, invisible everywhere else.

The same thing happens commercially. The group was quoted as a package. The jobs complete one at a time. Whether what got done matches what got sold is a question nobody asks until the client asks it.

What that costs

Two different bills.

The notes half costs you repeated conversations and decisions made on half the picture. An engineer turns up without the access detail somebody was given three weeks ago.

The reconciliation half costs you money directly. Work completed outside what was quoted, found weeks later when the client queries the total. By then you're either absorbing it or having an awkward conversation, and both are worse than having known at completion.

What the automation does

Notes across the group

  1. Fires the moment a note is added to any job in a group.
  2. Finds the group and every job in it.
  3. Writes the note against each one.

The completion check

  1. Fires on completion.
  2. Pulls every job in the group and the costs recorded against each.
  3. Matches each job to the quote it belongs to.
  4. Compares what was quoted, what was done and what's being billed.
  5. Summarises anything that doesn't line up, in plain language, for whoever reviews it.

What you need

  • A reliable way that groups are identified today. A job group reference, a shared quote number, a parent job.
  • A decision on which half you want, or both.
  • For the completion check, agreement on what happens when something doesn't match. Hold the invoice, or flag and carry on.

How it gets set up

  1. Start with the notes. It's a small build, your team sees it working immediately, and it proves the group reference is trustworthy before anything commercial gets built on top of it.
  2. Scope the completion check separately. It's a materially bigger piece of work, because it has to reconcile three sources rather than copy one field.
  3. Run the check in report-only mode first. A fortnight of telling you what it would have flagged is how the thresholds get set sensibly.

Common Questions

From whatever you already use. A job group reference, a shared quote number, a parent job. It doesn't impose a new way of grouping.

Fix that first. A check that compares the wrong things is worse than no check.

That's the default, and it can be limited by note type, so internal working notes stay put while client-facing ones travel.

No, and they shouldn't be quoted together. The notes are small. The check reconciles the quote, the work and the billing.

Whatever you decide. Hold the invoice until someone looks, or flag it and let it through.

Yes, though most people find the answer more useful once the group's complete.

Keep the group together

Get in touch with the Build Concierge team and we’ll set it up around the way you work.

Keep reading

More from the knowledge centre

WorkflowsAutomations

Survey Findings Sorted and Counted for Pricing

No more reading a forty-page report with a tally sheet. No more two people categorising the same findings differently. No more remedial found on site because the wording didn't match what somebody expected.

WorkflowsAutomations
Posted: 03.09.26Read time: 3 mins
WorkflowsAutomationsFinance

Shift Allowances and Night Shifts Costed Automatically

No more checking finish times against a rate card. No more allowances missed because nobody spotted the hours. No more engineers chasing money they're owed.

WorkflowsAutomationsFinance
Posted: 03.09.26Read time: 3 mins
WorkflowsAutomationsFinance

The Wrong Answer on a Worksheet, Caught

No more work described in a report and then never priced. No more quotes lost to a box ticked at the end of a long day. The answer gets checked against what the engineer actually wrote.

WorkflowsAutomationsFinance
Posted: 03.09.26Read time: 3 mins
WorkflowsAutomationsEquipment Hire

A Machine's Full Fault History, Back in Seconds

No more ringing the workshop to ask if anyone remembers this machine. No more opening job after job to piece together what happened last time. Text the serial number, get the history back.

WorkflowsAutomationsEquipment Hire
Posted: 03.09.26Read time: 3 mins
Friday FivesAutomations

Friday Fives: duplicates stopped, photos checked, costs coded

Five automations that stop duplicate jobs before they're raised, send incomplete instructions back to the sender, check completion photos against what was asked for, code costs the moment they land and strip supplier detail off quotes.

Friday FivesAutomations
Posted: 28.08.26Read time: 4 mins
WorkflowsAutomations

Survey Findings Sorted and Counted for Pricing

No more reading a forty-page report with a tally sheet. No more two people categorising the same findings differently. No more remedial found on site because the wording didn't match what somebody expected.

WorkflowsAutomations
Posted: 03.09.26Read time: 3 mins
WorkflowsAutomationsFinance

Shift Allowances and Night Shifts Costed Automatically

No more checking finish times against a rate card. No more allowances missed because nobody spotted the hours. No more engineers chasing money they're owed.

WorkflowsAutomationsFinance
Posted: 03.09.26Read time: 3 mins
WorkflowsAutomationsFinance

The Wrong Answer on a Worksheet, Caught

No more work described in a report and then never priced. No more quotes lost to a box ticked at the end of a long day. The answer gets checked against what the engineer actually wrote.

WorkflowsAutomationsFinance
Posted: 03.09.26Read time: 3 mins
WorkflowsAutomationsEquipment Hire

A Machine's Full Fault History, Back in Seconds

No more ringing the workshop to ask if anyone remembers this machine. No more opening job after job to piece together what happened last time. Text the serial number, get the history back.

WorkflowsAutomationsEquipment Hire
Posted: 03.09.26Read time: 3 mins
Friday FivesAutomations

Friday Fives: duplicates stopped, photos checked, costs coded

Five automations that stop duplicate jobs before they're raised, send incomplete instructions back to the sender, check completion photos against what was asked for, code costs the moment they land and strip supplier detail off quotes.

Friday FivesAutomations
Posted: 28.08.26Read time: 4 mins
WorkflowsAutomations

Survey Findings Sorted and Counted for Pricing

No more reading a forty-page report with a tally sheet. No more two people categorising the same findings differently. No more remedial found on site because the wording didn't match what somebody expected.

WorkflowsAutomations
Posted: 03.09.26Read time: 3 mins
WorkflowsAutomationsFinance

Shift Allowances and Night Shifts Costed Automatically

No more checking finish times against a rate card. No more allowances missed because nobody spotted the hours. No more engineers chasing money they're owed.

WorkflowsAutomationsFinance
Posted: 03.09.26Read time: 3 mins
WorkflowsAutomationsFinance

The Wrong Answer on a Worksheet, Caught

No more work described in a report and then never priced. No more quotes lost to a box ticked at the end of a long day. The answer gets checked against what the engineer actually wrote.

WorkflowsAutomationsFinance
Posted: 03.09.26Read time: 3 mins
WorkflowsAutomationsEquipment Hire

A Machine's Full Fault History, Back in Seconds

No more ringing the workshop to ask if anyone remembers this machine. No more opening job after job to piece together what happened last time. Text the serial number, get the history back.

WorkflowsAutomationsEquipment Hire
Posted: 03.09.26Read time: 3 mins
Friday FivesAutomations

Friday Fives: duplicates stopped, photos checked, costs coded

Five automations that stop duplicate jobs before they're raised, send incomplete instructions back to the sender, check completion photos against what was asked for, code costs the moment they land and strip supplier detail off quotes.

Friday FivesAutomations
Posted: 28.08.26Read time: 4 mins