Friday Fives: fault history, worksheet checks, allowances costed
Five real automations from the Build Concierge platform, picked for the week of 4 September.
What's in this week's edition
Friday Fives is Build Concierge's weekly newsletter:
5 real automations from businesses already using the platform, with what each one does, the problem it solves and the result.
This week covers the answers that are already in your system but nobody can get to: what's gone wrong with this machine before, whether the engineer's sign-off matches their own report, what was quoted against what's being billed on a group of jobs, whether that attendance qualified for a night rate, and how many of each type of finding are in a forty-page survey. All of it exists. None of it is quick to find.
Machine fault history
Someone texts or emails a serial number, an asset reference or a model, and asks what's gone wrong with it before. Build Concierge finds every previous attendance against that asset and replies with the history: the date, the job reference, who attended, what the fault was and what was done about it. No login, no searching, no ringing round.
The history is usually sitting in your system already. Getting at it means someone with the right access, in front of a screen, with time to look, which is rarely the person standing in front of the machine.
- Whoever's making the decision has the history in front of them within seconds, wherever they are
- An engineer knows what was tried last time before they start
- Repair-or-replace calls get made on the record rather than on a hunch
Worksheet answers checked
An engineer finishes a visit and answers the worksheet question that decides what happens next: is further work needed, or is this job done? That single answer sets the job's outcome and decides whether anything gets priced. Build Concierge reads the engineer's own report and photos, compares them against the answer they gave, and flags it when the two don't agree.
It's rarely carelessness. It's the last box on a long day, and the consequence of getting it wrong is revenue that was identified on site and quietly lost at close-down.
- Work that needs quoting gets quoted
- The answer that closes a job down is checked against the evidence next to it, on every job
- The engineer finds out while the detail is fresh rather than three weeks later
Jobs grouped and reconciled
Where work is raised as a group of related jobs, Build Concierge keeps the group together. A note added once appears against every job in the group rather than just the one someone happened to open. And when the work completes, each job in the group is checked back against the quote it belongs to, so what was quoted, what was done and what's being billed all line up before anything is invoiced.
The group only really exists at the point it's created. After that every job is on its own, which is how a conversation recorded on one job stays invisible on the other eleven.
- The group behaves like one piece of work, because that's what it is
- Anyone opening any job in it sees the full picture
- Reconciliation happens before the invoice rather than after the query
Allowances costed automatically
Build Concierge reads the attendance, works out whether it qualifies as a night shift under your rules, and posts the right allowance to the job automatically. Shift and unsocial-hours uplifts land as costed lines against the job, coded the way your accounts need them, without anyone checking a timesheet against a rate card.
Allowances get missed because nobody spotted the finish time, and they get applied inconsistently depending on who processed the job. Both problems are found at the end of the month, by which point somebody is rebuilding a week of timesheets.
- Every qualifying attendance carries its allowance, on the day, at the right rate
- Engineers are paid correctly without chasing
- Job costs reflect what the work actually cost you, so margin figures are real
Survey findings counted
A survey or inspection report arrives with dozens of findings written in an engineer's or a surveyor's own words. Build Concierge reads it, matches each finding against your own categories, counts how many fall into each, and returns the totals ready to price. Your categories, your rules, including which category wins when a finding could fall into two.
Done by hand it means reading the whole report with a tally sheet, which takes hours and gives a different answer depending on who reads it.
- A report becomes a priced schedule the day it lands, not the week after
- Every finding is categorised the same way regardless of who wrote it up
- Nothing is double counted, and nothing is missed because of unfamiliar wording
See these automations running in your operations
Whether you're already on Build Concierge or just exploring what it can do, we'll show you exactly how any of these five would work for your business.
Get five new automations every Friday
Subscribe once and a new edition lands in your inbox every Friday, five real automations, what they do and the results they get.
Subscribe to Friday Fives
More from the knowledge centre
Survey Findings Sorted and Counted for Pricing
No more reading a forty-page report with a tally sheet. No more two people categorising the same findings differently. No more remedial found on site because the wording didn't match what somebody expected.
Shift Allowances and Night Shifts Costed Automatically
No more checking finish times against a rate card. No more allowances missed because nobody spotted the hours. No more engineers chasing money they're owed.
Jobs Raised as a Group, Checked as a Group
No more a note added to one job and invisible on the other eleven. No more working through a group job by job with the quote open alongside. The group behaves like one piece of work, because that's what it is.
The Wrong Answer on a Worksheet, Caught
No more work described in a report and then never priced. No more quotes lost to a box ticked at the end of a long day. The answer gets checked against what the engineer actually wrote.
A Machine's Full Fault History, Back in Seconds
No more ringing the workshop to ask if anyone remembers this machine. No more opening job after job to piece together what happened last time. Text the serial number, get the history back.
Friday Fives: duplicates stopped, photos checked, costs coded
Five automations that stop duplicate jobs before they're raised, send incomplete instructions back to the sender, check completion photos against what was asked for, code costs the moment they land and strip supplier detail off quotes.
Survey Findings Sorted and Counted for Pricing
No more reading a forty-page report with a tally sheet. No more two people categorising the same findings differently. No more remedial found on site because the wording didn't match what somebody expected.
Shift Allowances and Night Shifts Costed Automatically
No more checking finish times against a rate card. No more allowances missed because nobody spotted the hours. No more engineers chasing money they're owed.
Jobs Raised as a Group, Checked as a Group
No more a note added to one job and invisible on the other eleven. No more working through a group job by job with the quote open alongside. The group behaves like one piece of work, because that's what it is.
The Wrong Answer on a Worksheet, Caught
No more work described in a report and then never priced. No more quotes lost to a box ticked at the end of a long day. The answer gets checked against what the engineer actually wrote.
A Machine's Full Fault History, Back in Seconds
No more ringing the workshop to ask if anyone remembers this machine. No more opening job after job to piece together what happened last time. Text the serial number, get the history back.
Friday Fives: duplicates stopped, photos checked, costs coded
Five automations that stop duplicate jobs before they're raised, send incomplete instructions back to the sender, check completion photos against what was asked for, code costs the moment they land and strip supplier detail off quotes.
Survey Findings Sorted and Counted for Pricing
No more reading a forty-page report with a tally sheet. No more two people categorising the same findings differently. No more remedial found on site because the wording didn't match what somebody expected.
Shift Allowances and Night Shifts Costed Automatically
No more checking finish times against a rate card. No more allowances missed because nobody spotted the hours. No more engineers chasing money they're owed.
Jobs Raised as a Group, Checked as a Group
No more a note added to one job and invisible on the other eleven. No more working through a group job by job with the quote open alongside. The group behaves like one piece of work, because that's what it is.
The Wrong Answer on a Worksheet, Caught
No more work described in a report and then never priced. No more quotes lost to a box ticked at the end of a long day. The answer gets checked against what the engineer actually wrote.
A Machine's Full Fault History, Back in Seconds
No more ringing the workshop to ask if anyone remembers this machine. No more opening job after job to piece together what happened last time. Text the serial number, get the history back.
Friday Fives: duplicates stopped, photos checked, costs coded
Five automations that stop duplicate jobs before they're raised, send incomplete instructions back to the sender, check completion photos against what was asked for, code costs the moment they land and strip supplier detail off quotes.





